ABSTRACT
Potgietersrust Platinums Ltd (PPRust) is Anglo Platinum’s only open pit operation. The major slope stability concern at PPRust is rapid, small-scale brittle failure on the west wall of Sandsloot open pit. In order to improve safety and mine more economically, a comprehensive slope monitoring strategy has been implemented. In the last 3 years four new state-of-the-art monitoring systems have been installed namely an ISSI microseismic monitoring system, a GeoMoS automated prism monitoring system, prismless Riegl laser scanners and a GroundProbe slope stability radar (SSR). Groundwater monitoring and visual monitoring have also been improved over the same time period. To complement the visual inspections, SiroVision digital photogrammetry is now used for predicting where future failures may occur. All these monitoring tools provide primary monitoring which is used to identify high risk areas. The SSR is then set up in that area to provide early warning of failure so evacuation can be successfully done. Fault tree analysis has proved that with this comprehensive slope monitoring strategy the geotechnical risk at PPRust is greatly reduced,
离线z3675802

发帖
203
监测币
2654101
威望
348
贡献值
1
金币
227
只看该作者 1楼 发表于: 2009-12-14
    
离线silencelion

发帖
387
监测币
1173062
威望
3469
贡献值
6
金币
6960
只看该作者 2楼 发表于: 2009-12-18
看了头大啊,全是英文。
快速回复
限100 字节
 
上一个 下一个